Dixie Gun Works

founded in 1954
Union City, Tennessee

largest supplier of blackpowder shooting equipment, parts and antique guns in the world

 

  • 1931 Turner E. Kirkland began collecting guns
    – paid seventy five cents for a “dug up” 1849 Colt Pocket pistol
  • 1938 By the time Turner entered college he owned about one hundred guns
  • World War II two years in the Pacific
  • 1948 small ad in Muzzle Blasts magazine
  • Friday, April 10, 1954 arrived home from one of my jewelry selling trips to find that nearly all the guns and parts I had advertised had been sold
    – realized I just might be able to make a living at what had been a hobby
  • Dixie Gun Works started
  • 1954 Dixie Gun Works Catalog
    – 700 plus page publication
    – illustrates more than 10,000 items
  • 1955 Dixie Kentucky Rifle first production made muzzleloading rifle
  • 1955  purchased a 4000 square foot building
  • 1960 built a 12,000 square foot building
  • 1968 moved to its current location 30,000 square foot
  • 1974 added on 46,000 square feet
  • 1978 Dixie Gun Works Blackpowder Annual
    – 75,000 sent out
  • Dixie Gun Works Old Car Museum
    – 1850’s period log cabin gun shop
  • July 26, 1997 Turner Kirkland died (77)

Dixie Gun Works
1412 W Reelfoot Ave
Union City, Tennessee 38261

731 885 0440

dixiegunworks.com

Profiles on Minuteman University.com are editorial content compiled from public sources. Inclusion does not imply endorsement of, sponsorship by, or affiliation with this site or the Gun Websites Firearms Network. Corrections and removal requests are welcome through Contact Us.

Timeline of Dixie Gun Works from Turner Kirkland's collecting in 1931 to 1997